Almost done up front, got the new master cylinder mount welded in. I ended up cutting the main hole with the plasma cutter a bit small and grinding it out to fit. I found a socket in my 3/4 set that matched the master cylinder diameter perfectly so I didn’t have to keep jamming the soft rubber boot in and out for test fitting.
I also got the wraps around the front where the beam mounts and got those drilled out with pilot holes. Now that they are drilled I’ll take a large big and bore it out and insert a steel sleve int here for the bolt to go through. Should end up being uber strong.